Math 2.0

Partial differential equations Definition

A priori estimate

Builds on Partial differential equationBanach space

Definition

Let XX and YY be normed spaces of functions, for example Banach spaces, and let ℱ\mathcal{F} be a class of data f∈Yf \in Y. Consider a partial differential equation or boundary value problem A(u)=fA(u) = f. Let C ⁣:[0,∞)→[0,∞)C \colon [0, \infty) \to [0, \infty) be a function, often linear, that does not depend on uu. An a priori estimate for this problem is an inequality ∥u∥X≤C(∥f∥Y)\norm{u}_X \le C(\norm{f}_Y). It must hold for every solution u∈Xu \in X of A(u)=fA(u) = f with f∈ℱf \in \mathcal{F}. The estimate assumes that uu is a solution in XX; it asserts nothing about the existence of uu.

Remarks

Example: let Ω⊆ℝn\Omega \subseteq \R^n be bounded and open, f∈L2(Ω)f \in L^2(\Omega), and let u∈H01(Ω)u \in H^1_0(\Omega) be a weak solution of −Δu=f-\Delta u = f. Testing with uu gives ∫Ω∣∇u∣2=∫Ωfu≤∥f∥L2∥u∥L2\int_\Omega \abs{\nabla u}^2 = \int_\Omega f u \le \norm{f}_{L^2} \norm{u}_{L^2}. By the Poincaré inequality, ∥u∥L2≤CP∥∇u∥L2\norm{u}_{L^2} \le C_P \norm{\nabla u}_{L^2}, hence ∥∇u∥L2≤CP∥f∥L2\norm{\nabla u}_{L^2} \le C_P \norm{f}_{L^2}. The constant depends only on Ω\Omega.

Non-example: a bound ∥u∥X≤C(u)\norm{u}_X \le C(u) with a constant that depends on the particular solution is not an a priori estimate. It gives no uniform control over a family of solutions.

The Schauder estimates and Calderón–Zygmund estimates are a priori estimates in Hölder and LpL^p norms. Combined with the Leray–Schauder fixed point method or the method of continuity, a priori estimates yield existence.

Reading path

To understand this page from the ground up, read these 3 pages in order. The foundations come first.

Show the path as a graph
Each page uses the pages above it. The colour of the bar on a box shows how strong the evidence is, and the box also gives it as text. The list has the same pages.
  • no evidence level
  1. Banach space concept
  2. Partial differential equation concept
  3. A priori estimate definition

Further reading

  1. Web https://en.wikipedia.org/wiki/A_priori_estimate
About this page
TagZX8972MACG
URIm2://ZX8972MACG
Kinddefinition
WritingW0 stub
MSC35B45, 35A01
DefinesA priori estimate
UsesPartial differential equation, Banach space

Markdown · JSON · Edit on GitHub

What this page needs for W1

  • an inventory row: the row of the inventory that the node accounts for (0 of 1)
  • a source with a locator (0 of 1)

The writing levels say how complete the text of a page is. They do not measure its truth.

What links here

No page links to this page yet.